DSE are pleased to announce the release of the new 7310/7320 Phase 8 Control Modules.
The new version offers a wide range of outstanding new features and benefits. Please take some time to familiarise yourselves with the new features (listed below) that are available. Should you require further information on the 73xx control [...]
Dears,
Please simply CLICK below link to VIEW and DOWNLOAD our latest products catalogue.
http://pgd-catalogue.woodward.de/
Application of protection systems, stipulated by the standards, in installations comprising a UPS, requires a number of precautions for the following reasons:
The UPS plays two roles
- A load for the upstream system
- A power source for downstream system
When the battery is not installed in a cabinet, an insulation fault on [...]
Selection of battery type
A battery is made up of interconnected cells which may be vented or of the recombination type.
There are two main families of batteries:
Nickel-cadmium batteries Lead-acid batteries Vented cells (lead-antimony): They are equipped with ports to
- Release to the atmosphere the oxygen and hydrogen produced [...]
Types of static UPSs are defined by standard IEC 62040.
The standard distinguishes three operating modes:
Passive standby (also called off-line) Line interactive Double conversion (also called on-line)
These definitions concern UPS operation with respect to the power source including the distribution system upstream of the UPS.
Standard IEC 62040 defines the following [...]
The disturbances presented above may affect:
Safety of human life Safety of property The economic viability of a company or production process
Disturbances must therefore be eliminated.
A number of technical solutions contribute to this goal, with varying degrees of effectiveness. These solutions may be compared on the basis of two criteria:
Availability of [...]
Parallel-connection of the generator set irrespective of the application type – Safety source, Replacement source or Production source – requires finer management of connection, i.e. additional monitoring functions.
Parallel operation
As generator sets generate energy in parallel on the same load, they must be synchronised properly (voltage, frequency) and load distribution must [...]
Priority circuit protection
Choice of breaking capacity
This must be systematically checked with the characteristics of the main source (MV/LV transformer).
Setting of the Short Time Delay (STD) tripping current
Subdistribution boards
The ratings of the protection devices for the subdistribution and final distribution circuits are always lower than the generator rated current. Consequently, except [...]
Figure N2 below shows the electrical sizing parameters of a Generator Set. Pn, Un and In are, respectively, the power of the thermal motor, the rated voltage and the rated current of the generator.
Fig N2: Block diagram of a generator set
[edit] Overload [...]
Lessons-in-electrical-circuits2 Arc-proof low voltage switchgear and controlgear assemblies ABB circuit-breakers for direct current applications ABB circuit-breakers inside LV switchboards Cahier technique no. 114:Residual current devices in LV Double Ground Fault Protection Implementation By ABB protection principles PROTECTION APPLICATION HANDBOOK PROTECTIVE RELAYS PRINCIPLES AND APPLICATIONS SEMINAR